A Review on Waste Reduction through Value Stream Mapping Analysis

Praveen Saraswat, Manoj Kumar Sain, Deepak Kumar

Abstract


abstract

Keywords


Production time, Value stream mapping, Non value added time

Full Text:

PDF

References


Bo, M., & Mingyao, D. (2012). Research on the Lean Process Reengineering Based on Value Stream Mapping. Management Science and Engineering, 6(2), 103-106.

D. Rajenthira Kumar, P. R. (2010). Implementation of Lean Assembly Line: A Case Study. International Journal of Engineering.

D. Rajenthirakumar, R. G. (2011). Analyzing The Benefits of Lean Tools: A Consumer Durables Manufacturing Company Case Study. International Journal Of Engineering.


Refbacks

  • There are currently no refbacks.




Copyright (c) 2014 Praveen Saraswat, Manoj Kumar Sain, Deepak Kumar

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

All published Articles are Open Access at https://edupediapublications.org/journals/.
Written by Different Authors is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License.
Based on a work at https://edupediapublications.org/journals/.
Permissions beyond the scope of this license may be available at http://edupediapublications.org/journals/index.php/ijr/pages/view/Policies-of-IJR.

Paper submission: submit@internationaljournalofresearch.org

Editor-in-Chief       editor@internationaljournlaofresearch.org

Mobile:                  +919557022047 & +919958037887

Websites   https://edupediapublications.org/journals/.

Journals Maintained and Hosted by

EduPedia Publications (P) Ltd in Association with Other Institutional Partners

http://edupediapublications.org/